News Flash

Community News

Posted on: March 25, 2020

2020 Roadway Projects

An interactive 2020 Roadway Projects map is now available on the Village website. Go to the  Roadway Construction page of the Village website, and scroll down to "Roadway Projects" for more information.  

Update (4/2/20): 

The Walnut Street Alley was originally scheduled for an asphalt grind and resurface for 2020. During preliminary design engineering, it was discovered that the existing alley pavement is 50%-60% porous, allowing storm water to seep into the ground. If resurfaced, the pavement would become completely impervious and storm water would be forced to flow west, in the direction of the the existing grade. Currently, drainage to the sewer system at this location is not sufficient to handle that storm water and it would be forced onto private property. Unfortunately, asphalt grind and resurface projects do not allow for major grade changes to existing roadways and larger improvements to the sewer system.

Staff has removed the project from the 2020 schedule and will begin reviewing options for the near future. The project will require the reconstruction of the pavement, upgrade to the sewer system and proper grade changes to direct storm water. 

Facebook Twitter Email

Other News in Community News