2019 Roadway Referendum Project

Clausen Avenue and Lawn Avenue Concrete Reconstruction


Clausen Avenue, from Ogden to 41st, and Lawn Avenue, from Elm to 47th, will undergo a concrete reconstruction in 2019.

This project will include the following components:

  • Complete removal of the existing roadway
  • Installation of new concrete roadway pavement, curb, and gutters
  • Repairs to existing sewer main
  • Installation of new relief sewer main on Lawn Avenue
  • Installation of new 8" water main on Clausen Avenue (more information below)
  • Driveway aprons will be removed and replaced to meet Village Code with standard concrete
  • Crosswalks within the scope of the project will be reconstructed to meet ADA standard

Specific information on how a concrete reconstruction will effect the area can be found on the "General Information on Road Construction" page.  The presentation and informational handout from the public meeting will be posted here once it is available.

2019 Roadway Referendum Project

Clausen Avenue Water Main Replacement

The Village is installing a new 8” water main on Clausen Avenue (41st - Ogden) in 2019 to replace the existing 4" water main. The installation of the new water main fully funded by the Illinois Environmental Protection Agency (IEPA) loan program. The Village sent a letter to residents on Clausen on January 16, 2019 outlining the issues with reconnecting existing lead service lines to the new water main. If you believe you had a lead water service, please view the letter below. If you are unsure about the composition of your water service, please visit www.wsprings.com/water for more information.